Transmitting antenna automatic control system engine room

In Electronic Infomation Category: T | on April 18,2011

Abstract: Room C of the 594 sets new antenna control system are the main functions were introduced to analyze the antenna control system, the sampling circuit and R6683-21 datasheet and control circuit of the principle, while the operating system software interface and R6683-21 price and the basic flow chart introduced.

1 Introduction

Information technology with the launch pad in depth, in order to achieve launch fully automated engine room monitoring system control, I sets C 150kW shortwave transmitter room five new automatic control system of the antenna. Transmitting antenna control system as a subsystem of the engine room monitoring system can be monitored by remote control room, engine room monitoring system for the antenna control interface and R6683-21 suppliers and data upload interface; to provide manually or automatically, independently of the antenna coaxial switches and switch sites switch control; automatic mode, day running schedule control system automatically switching according to the work; can control the antenna operation and fault records, statistics and query; the same time to complete the antenna, dummy load working condition monitoring. Antenna to my room the following automatic control system for a brief introduction.

2 antenna basic structure of the automatic control system

Antenna automatic control system used on the computer and industrial control with optocoupler isolated DI / O board design. With optocoupler isolated DI / O board primarily composed of a number of optical couplers, the antenna can be controlled by automatic control unit and electrical isolation between objects to ensure the stability of the system work. Among them, the industrial computer using Advantech original IPC-610 (P42.8G, 512M, 80G hard drive, comb drive, 10/100M Ethernet LAN networking), 17-inch touch screen display industry as the display terminal; digital input with Advantech PCI- 1752 (64 PC104 bus input into the board) and output card with Advantech PCI-1754 (64 Way out of PC104 bus output board).

2.1 System components

Antenna control system including hardware and software parts.

Hardware system consists of three parts:

(1) management and control center: the main by the IPC and the DI / O card form (including the touch screen, mouse, keyboard and other peripheral equipment).

(2) antenna control and status of sampling units: the main by the control and sampling circuit.

(3) controlled units: the main site by a coaxial switches and switch.

LABVIEW software systems written language, mainly include: automatic operation, manual operation, the data records.

2.2 System Control Theory

Figure 1, automatic control system for the control of the antenna block diagram. The system consists of industrial control computer system management and control, control by the software system through the DI / O card, control instructions issued by the control circuit, control circuit under the control instruction to the execution units (controlled object: coaxial switch and space switch ) for the corresponding control action, so that the antenna corresponding to the designated location; the same time, the sampling circuit switching state of controlled object is sampled by DI / O card back to the industrial control computer.


antenna in Figure 1 Block diagram of automatic control system control

3 hardware control section

3.1 the location of the controlled object relations

Antenna object of automatic control system is mainly controlled coaxial switch and space switch, and they are controlled by the control circuit. Figure 2 shows the coaxial switch (KT) and the venue switch (K) control schematic.


Figure 2 coaxial switch (KT) and the venue switch (K) control schematics

Coaxial switch KT0-KT4 has two operating states, namely: the antenna position and leave the load position. That the transmitter antenna connected to the corresponding bit on the antenna; dummy load that the transmitter is connected to the corresponding bit off the load. Venue switch K1, K2, K3, K4, K5 also has two working conditions, namely: direct and steering, this time through that site directly connected to the antenna switch in accordance with the Cross; turning point that shifted the direction of sites connected by the antenna switch. On behalf of the broadcasters can use any pair of antennas, C01 machines, C02 machines, CO3 machine, C04 machine connected to the machine in addition to the antenna, the antenna can only be followed with the next level, namely: C01 machine can be connected to 301,302, 303,304,305, spare antenna; C02 machine can be connected to 302,303,304,305, spare antenna; C03 machine can be connected to 304,305, spare antenna; C04 machine can be connected to 305, with antenna.

3.2 coaxial switch control and sampling circuit

3.2.1 features:

(1) completion of the coaxial switch control.

(2) realization of the antenna position and the dummy load bit hardware latch.

(3) coaxial switch position on the state of completion of sampling.

(4) whether the added pressure to complete the transmitter judgments.

(5) completion of the dummy load switch is on the judge.

3.2.2 coaxial switch control and sampling circuit

Figure 3 coaxial switch KT0-KT4 control and sampling theory, Figure 4 Schematic diagram of coaxial switch. The switch inside the coaxial drive motor is 220VAC control. In Figure 3, A relay control relay for the antenna in place, C relays in place for the antenna relay sampling; B relay control relay for the dummy load in place, D dummy load in place for the sampling relay relay. A, B, C, D relays are 24VDC control.


Figure 3 coaxial switch KT0-KT4 control and sampling theory


coaxial switch control diagram of Figure 4

(1) antenna in place control and sampling

Need to turn the antenna when the coaxial switch position, the industrial computer 01 commands the client will send a low level, through the normally closed relay contacts C A C4 relay line to the bottom of the package, A relay energized after the , the normally open contacts connected to A2, 220VAC control voltage is sent to the 14 end of the switch coaxial, coaxial switch drive motor is powered and began to turn (see Figure 4), when the coaxial switch and antenna in place, Coaxial 24V the switch sends the antenna 15 side in place of information relay line package instructions to the top of C, C relay energized pull, C relay normally closed contact C4 off, A loss of power line package relay off immediately open, the normally open contacts A2 disconnect coaxial drive motor power switch, while, C relay normally open contact C1 connected, the +24 V signal is sent to the antenna in place of the sample IPC DI / O card 11 side , this, complete control of the antenna in place.

(2) leave in place the load control and sampling

Need to turn off when the coaxial switch the load position, the industrial computer 02 commands the client will send a low level, through the normally closed relay contacts D D4 line package sent to the bottom of the relay B, B machine appliances have power, its normally open contacts connected to B2, 220VAC control voltage is sent to the 16 end of the switch coaxial, coaxial drive motor is the switch power and began to turn (see Figure 4); when the coaxial switch and dummy load connection in place, coaxial switch sends 24V 17 side in place of false information in order to load relay line package on top of D, D pull the relay is energized, D D4 disconnect relay normally closed contact, B relay line package immediately disconnect the power failure, the normally open contacts B2 disconnect coaxial drive motor power switch, while, D D1 connected to the relay normally open contacts will be +24 V false signals sent to the load in place of sampling IPC DI / O card 12 side, this, false complete control of the load in place.

3.3 sites and sampling switch control circuit

3.3.1 Function

(1) completion of the venue switch control.

(2) the hardware locking feature.

(3) complete the switch position on the status of the sampling site.

3.3.2 site and sampling switch control circuit

Figure 5 for the site control of the switch K1-K5 and sampling theory, Figure 6 Schematic diagram of steering control switch for the site, Figure 7 through the control switch for the site diagram. The switch inside the coaxial drive motor is 220VAC control.


Figure 5, the switch K1-K5 site control and sampling theory


Figure 6 Schematic diagram of steering control venue switch


Figure 7 venues through control switch diagram

In Figure 5, A relay switch for the steering control relay site, C relay switch is in place for site sampling relay; B relay switch through control relay for the site, D through the relay switch in place for site Sampling relay. A, B, C, D 24VDC relays and switches are controlled venues.

(1) steering drive control and sampling

Spot to switch in direct position, need to turn the steering position, the industrial computer 20 sends a low-side instructions, the C relay normally closed contact C3, added to the bottom of the package A relay line, A After power relay, the normally open contacts connected to A2, +24 V control voltage is added to the site end of the switch 4, the venue was electric drive motor switch operation (see Figure 6, Figure 7); on the spot to switch from the straight position to shift bits in place, the site sends the switch 5-24V high-side instruction in place of information, and added to the bottom line package relay C, C pull relay energized, its normally closed contact C3 is disconnected A loss of power to the relay and immediately disconnected, A normally open relay contacts A2 off, the venue switch drive motor 24V power at the same time, C connected to the relay normally open contact C1 will turn 24V signal to send the sample in place information to the IPC DI / O card 30 side, the steering drive control to complete.

(2) Direct drive control and sampling

To switch in steering position of the spot, you need to turn to the straight position, the industrial computer 21 sends a low-side instruction, the normally closed relay contacts D D3, added to the bottom line package relay B, B After power relay, the normally open contacts connected to B2, +24 V control voltage is added to the site end of the switch 6, the venue was electric drive motor switch operation (see Figure 6, Figure 7); on the spot to switch from the steering position Go straight bit in place, the site sends the switch 7-24V high-side instruction in place of information, and added to the bottom line package relay D, D pull the relay is energized, the normally closed contact D3 disconnect the B relay loss of electricity, immediately disconnect, B B2 off the relay normally open contacts, the venue switch drive motor 24V power at the same time, D D1 connected to the relay normally open contacts, the 24V signal through the sample in place to send information to the IPC DI / O card 31 side, a straight drive control to complete.

3.4 system security measures

(1) increase pressure transmitter, the switch does not allow all of its corresponding switch.

(2) transmitter antenna should be in the position, rotate the antenna is not in place; transmitter dummy load should be in place, while not turning off the load in place, the transmitter can not add pressure.

(3) the blocking signal is not in place, the transmitter can not add pressure, so the system needs to determine whether the added pressure of every transmitter, antenna or dummy load to determine whether the rotation in place.

(4) To ensure that the transmitter plus high security hardware and software system design blocking signal, hardware lock switch and the coaxial switch from the given site, the software blocking signal is given by the system, when the pressure increases to meet the conditions, given software system software blocking signal, blocking signal when the software and hardware are met, the system can add pressure.

4 System Software

System software design is the use of industrial control computer platforms, in order to complete the full functionality of the antenna control system for the purpose of, in simple, practical, user-friendly, beautiful and carried out.

4.1 software features

Automatic antenna switching system function block diagram shown in Figure 8.


Figure 8 automatic antenna switching system function structure chart

Automatic antenna switching system functions as follows:

(1) automatic antenna switching system to achieve the automatic antenna switching the switch to determine the need to connect the transmitter antenna or dummy load. The switch to control the antenna includes: manual, electric control and automatic control of three modes.

Manual operation: mechanical switching antenna using the switch. (The system should not be in the automatic mode, and have cut off the drive power corresponding measures, protective equipment and personal safety, but monitoring is still valid.) Electric control: the control cabinet or control panel, through artificial control of the power switch, to achieve the switch the antenna switch.

Automatic control: According to the operating schedule, with regular time pulse switch according to the switch to achieve automatic control of the antenna.

(2) automated system to switch between operating modes, the host computers screen, select, each switch, you must keep the original antenna switching operation of the system state.

(3) automatic operation, the system automatically receives the remote room operation chart issued and work according to diagram.

(4) manual operation, the system administrator can directly modify the diagram of the monitoring system, complete system control; privileges on the system administrator can also control the switch status of each edit, modify data artificially.

(5) log management capabilities: the ability of the administrator of the operating conditions, alarms and other information to conduct a comprehensive records, for easy viewing system operation.

4.2 interface

(1) welcome screen.

Welcome screen shown in Figure 9.


Figure 9, the Welcome screen

Description: Login interface provides a user authentication feature, only the identity and password with administrator users can use the system to ensure safety.

(2) Working mode selection

Description: The system provides automatic and manual mode, the user can choose to use after logging; log for system usage and fault records, the user can directly access this view.

(3) The main interface (automatically)

Antenna system automatically runs the main interface shown in Figure 10.


Figure 10, the antenna system to automatically run the main interface

Description:

the basic functions of the system for automatic, manual, log viewing, the bottom of the main interface is displayed as a button.

in Figure 10, the green lines represent the channel broadcasting machine connected to the antenna, gray antenna channel is not connected.

Blue line, said channel connected to the antenna on behalf of broadcasters.

4.3 software, the basic flow chart

Flow chart for software implementation of the primary process, complete system functions (see Figure 11). A simple implementation of the process as follows.


implementation flow chart in Figure 11

Choosing a need to switch the device (or switch), then click "Run" button, to achieve the antenna and the dummy load, on behalf of the sowing machine and automatically switch the transmitter, perform the following steps:

First step: wait for "Run" command, if the "executive"

Command arrives, the implementation of the second step.

Step two: Check the status of the transmitter to see if the connection to the relevant transmitter, the transmitter connection if found, perform the third step, or cancel the execution and issued a warning prompt.

Third step: the implementation of the switch coaxial control procedures to achieve antenna and automatically switches off the load.

Fourth step: the implementation of control procedures venue switch, transmitter and on behalf of the broadcasters to achieve the automatic switching.

5 Conclusion

Antenna control system has been put into use more than 2 years, broadcast daily in the security operation, the system is stable, the use of simple and flexible, not only reduces the maintenance workload of the engine room watch keeping, but also reduce the failure rate for the room safe broadcast played a strong role in safeguarding.